Large US food processing company for their Dutch facility
In 2023/24, NuReSys put a new installation at one of the global US origin food processing company that is one of the world’s largest producers and processors of frozen french fries, waffle fries, and other frozen potato products. Here the goal was to remove bulk of Phosphorus and reduce nutrient flow towards post aerobic treatment. Also, our IPM system helped to avoid FeCl3 after anaerobic treatment since they were required to do so, as per discharge requirements.
Design Flow
m3/hour
340
P04-P INFLUENT
mg P/I
70-80
Biggest Potato manufacturing plant in Netherlands
The installation here is of the effluent from the production of potato manufacturing plant, which is first treated in an UASB reactor. The effluent is further treated in an aerobic biological treatment stage for further P and N reduction. The phosphate was formerly reduced by addition of FeCl3. The total volume is bypassed though the NuReSys-P plant where the PO4-P concentration is reduced from 120 ppm to average 20 ppm. The installation was retrofitted to an existing UASB reactor giving immediate positive RoI.
Design Flow
m3/hour
120 UASB
P04-P INFLUENT
mg P/I
150
Dairy processing plant in Germany
NuReSys constructed the “Phosphate-Recovery-System”; for a subsidiary of a corporate group specializing in dairy products and baby food, producing raw milk and various cheeses at its facility. Goal here was to make sure less nutrients come in the aerobic treatment.
Design Flow
m3/hour
125 UASB
P04-P INFLUENT
mg P/I
60-65
Another project with the same Potato manufacturing at another site in NL
After having experienced excellent results with the NuReSys-P technology at their first site, client decided to equip also the other plant location with the phosphate recovery technology of NuReSys.
Design Flow
m3/hour
120 UASB
P04-P INFLUENT
mg P/I
130-175
Biggest Potato Processor in Belgium
Here, the effluent from the production of French Fries is first treated in an UASB reactor. The effluent is further treated in an aerobic biological treatment stage for further P and N reduction. The phosphate was formerly reduced by addition of FeCl3. Later, the total volume is bypassed though the NuReSys-P plant where the PO4-P concentration is reduced to average 20 ppm.
Design Flow
m3/hour
60 UASB
P04-P INFLUENT
mg P/I
100
and more....
Large US food processing company for their Dutch facility
In 2023/24, NuReSys put a new installation at one of the global US origin food processing company that is one of the world’s largest producers and processors of frozen french fries, waffle fries, and other frozen potato products. Here the goal was to remove bulk of Phosphorus and reduce nutrient flow towards post aerobic treatment, as per discharge requirements.
Design Flow
m3/h
340
P04-P INFLUENT
mg P/I
70-80
Biggest Potato manufacturing plant in Netherlands
The installation here is of the effluent from the production of potato manufacturing plant, which is first treated in an UASB reactor. The total volume is bypassed though the NuReSys-P plant where the PO4-P concentration is reduced to average 20 ppm. The installation was retrofitted to an existing UASB reactor giving immediate positive RoI.
Design Flow
m3/h
120 UASB
P04-P INFLUENT
mg P/I
150
Dairy processing plant in Germany
NuReSys constructed the Phosphate-Recovery-System for a subsidiary of a corporate group specializing in dairy products and baby food, producing raw milk and various cheeses at its facility. Goal here was to make sure less nutrients come in the aerobic treatment.
Design Flow
m3/h
125 UASB
P04-P INFLUENT
mg P/I
60-65
Another project with the same Potato manufacturing at another site in NL
After having experienced excellent results with the NuReSys-P technology at their first site, client decided to equip also the other plant location with the phosphate recovery technology of NuReSys.
Design Flow
m3/h
120 UASB
P04-P INFLUENT
mg P/I
130-175
Biggest Potato Processor in Belgium