Skip to content Skip to footer

Phosphorus Management and Equipment Protection at U.S Water Reclamation Facility

The Grand Rapids, MI, Water Reclamation Facility designed a new anaerobic digestion and dewatering facility with the goals of preventing struvite scaling, breaking the phosphorus recycle loop, and recovering phosphorus for reuse. Partnering with our local partner Schwing Bioset, they implemented Nuresys technology to create a two-stage phosphate management system.

Design Flow
m3/hour

20

P04-P INFLUENT
mg P/I

150

Nutrient Recovery System at Tres Rios Water Reclamation Facility (WRF) in Arizona, US

Award winning project with our local partner in US, Schwing Bioset. The primary objective of NuReSys installation was to precipitate struvite within the digestate stream for removal with the biosolids. By converting a minimum of 85% of the available orthophosphate into crystalline form, the phosphorus recycle stream back into the plant is broken. Additionally, due to the flexibility and two stage operation of the NuReSys technology, power demands are roughly 1/3 of the performance guarantee values, resulting in significant annual savings.

Design Flow
m3/hour

55

P04-P INFLUENT
mg P/I

250

Centrate Struvite System in Lodz, Poland

This Centrate installation built around 2023 focuses on struvite formation in the second biggest waste water treatment plant in Poland. Here, the goal was to reduce the chemical use in Waterline hence NuReSys system was implemented to cut the P loop and recover Phosphorus at the same time.

Design Flow
m3/hour

80-100

P04-P INFLUENT
mg P/I

300-350

Hybrid NuReSys System in Netherlands

Here the goal was to revamp the sludge line and to prevent scaling on centrifuges. NuReSys put up a HYBRID installation where the Stripper is placed at the outlet of the digester and the struvite formation in the pumps, lines and hydro-extractors is highly reduced. The Struvite Crystalliser is installed after the hydro-extraction. reducing the internal P loop.

Design Flow
m3/hour

140

P04-P INFLUENT
mg P/I

450

Centrate P-recovery technology in NL

Together with our partners Logisticon, the tender was won to supply P recovery technology along with Demon installation. Goal of Nuresys technology was again to cut he P loop reducing the high amounts of Phosphate.

Design Flow
m3/hour

5

P04-P INFLUENT
mg P/I

650

Digested Sludge Processing in Belgium

The scope of this installation was to investigate the technical implementation and impact in the pre- and post processing of the digested sludge. The challenge we solved was to separate the struvite from the sludge in a smart way.

Design Flow
m3/hour

8

P04-P INFLUENT
mg P/I

100

P-recovery system in Warsaw, Poland

Installation for phosphorus recovery and extracting struvite (MgNH4PO4.6H20 or MAP) installed on sludge processing line of wastewater treatment plant. The installation here is also Centrate. Here, the focus was to reduce the P loop and extract P from dewatered sludge.

Design Flow
m3/hour

40

P04-P INFLUENT
mg P/I

390

Centrate installation in Lower Saxony, Germany

A two centrate Nuresys system was installed here to reduce the P loop and prevent scaling issues.

Design Flow
m3/hour

20

P04-P INFLUENT
mg P/I

100



and more....

Phosphorus Management and Equipment Protection at U.S Water Reclamation Facility

The Grand Rapids, MI, Water Reclamation Facility designed a new anaerobic digestion and dewatering facility with the goals of preventing struvite scaling, breaking the phosphorus recycle loop, and recovering phosphorus for reuse.

Design Flow
m3/h

20

P04-P INFLUENT
mg P/I

150

Nutrient Recovery System at Tres Rios Water Reclamation Facility (WRF) in Arizona, US

Award winning project with our local partner in US, Schwing Bioset. The primary objective of NuReSys installation was to precipitate struvite within the digestate stream for removal with the biosolids. The flexibility of the technology, resulted in significant annual energy savings.

Design Flow
m3/h

55

P04-P INFLUENT
mg P/I

250

Centrate Struvite System in Lodz, Poland

This Centrate installation built around 2023 focuses on struvite formation in the second biggest waste water treatment plant in Poland. Here, the goal was to reduce the chemical use in Waterline hence NuReSys system was implemented to cut the P loop and recover Phosphorus at the same time.

Design Flow
m3/h

80-100

P04-P INFLUENT
mg P/I

300-350

Hybrid NuReSys System in Netherlands

Here the goal was to revamp the sludge line and to prevent scaling on centrifuges. NuReSys put up a HYBRID installation where the Stripper is placed at the outlet of the digester and the struvite formation in the pumps, lines and hydro-extractors is highly reduced.

Design Flow
m3/h

140

P04-P INFLUENT
mg P/I

450

Centrate P-recovery technology in NL

Together with our partners Logisticon, the tender was won to supply P recovery technology along with Demon installation. Goal of Nuresys technology was again to cut he P loop reducing the high amounts of Phosphate.

Design Flow
m3/h

5

P04-P INFLUENT
mg P/I

650

Digested Sludge Processing in Belgium

The scope of this installation was to investigate the technical implementation and impact in the pre- and post processing of the digested sludge. The challenge we solved was to separate the struvite from the sludge in a smart way.

Design Flow
m3/h

8

P04-P INFLUENT
mg P/I

100

P-recovery system in Warsaw, Poland

Installation for phosphorus recovery and extracting struvite installed on sludge processing line of wastewater treatment plant. The installation here is also Centrate. Here, the focus was to reduce the P loop and extract P from dewatered sludge.

Design Flow
m3/h

40

P04-P INFLUENT
mg P/I

390

Centrate installation in Lower Saxony, Germany

A two centrate Nuresys system was installed here to reduce the P loop and prevent scaling issues.

Design Flow
m3/h

20

P04-P INFLUENT
mg P/I

100


and more....

Office

  admin@greentiletech.com

Green Tile BV

 Harelbeekstraat 104D,
 Zwevegem – 8550                     Belgium                                                         +32 485 06 93 57

NuReSys India Private Limited

CC 7, GIDC, Valsad – 396001,
Gujarat, India                                           
+91 98241 48109

Schwing Bioset Inc.                      (US partner)

350 SMC Drive
Somerset, WI 54025, USA
+001 (715) 247-3433

Nuresys do Brasil LTDA

Rua dos Manacás-Da-Serra, 394
Biopark, Toledo – PR, 85920-268 Brésil
+55 (41) 99972-1423

Get in Touch
Offices
Europe

Green Tile BV                                                                Harelbeekstraat 104D,                                           

Zwevegem – 8550, BE

NuReSys India Private Limited 

CC 7, GIDC, Gundlav,                                                

Valsad – 396001, Gujarat, India

USA Partner

Schwing Bioset                 

350, SMC Drive Somerset,   

WI 54025                                                  

-----------------------------------------
Get in Touch
NuReSys © 2024. All Rights Reserved.
NuReSys © 2024. All Rights Reserved.